    You could probably get better pricing than blackwoods....unless it the most convenient

  2. #12
    Join Date
    Dec 2016
    Location
    Buderim Qld
    Posts
    137
    Total Downloaded
    0
    I recently replaced some v belts with link belts on two older Hercus lathes. Like you, to remove all the shafts would have been a mammoth task. They work a treat.

  3. #13
    Join Date
    Mar 2010
    Location
    Queensland
    Posts
    4,125
    Total Downloaded
    12.97 MB
    Quote Originally Posted by gromit View Post
    Brammer belting is what you are looking for.
    Still available but no personal experience of using it.

    Colin
    Following on from Colin,

    I used Brammer belting for years and found it very reliable stuff to use. I worked in Parks & Gardens in local government. Brammer belts were used as the drive belt between the dogged self-propelled drive heavy duty walk-behind slashers. A well adjusted belt could haul the mower up and the operator from the bottom of the Bremer River bank to the top - while slashing the vegetation down. These mowers had dual rear wheels with the drive dogs only having contact with the inside tyres.

    They Brammer belts were very easy to adjust when some stretching occurred after prolonged use. Just remove one link set and reinstall the belt and away you went again. I used to be damn fit too at the time.

    Here is a link to an Australian supplier - Brammer Belting - F & D O'Connor Pty Ltd

    Prior to studying Horticulture I worked at a steam powered abattoir located in country Queensland and a lot the machinery utilised Brammer belts too.

    Kind regards
    Lionel

  4. #14
    Join Date
    Jan 1970
    Location
    Cessnock NSW
    Posts
    4,990
    Total Downloaded
    0
    About 2 years back now I bought a new lathe to replace my old one, anyway I decided to see if I could fix my old one and I did but to cut a long story short I didn't want to have to remove the shafts n bearings as they are damn heavy, so I cut the belt and when I had made the changes in the old machine I bought a length of 'Brammer' belting from a store in Melbourne, it works a treat, easy as, I did try to get it through a local bearing service, where the cost per meter was more than the total cost of the length I needed + postage from Melbourne, cheers Dennis

  5. #15
    Join Date
    Jun 2009
    Location
    Queensland
    Posts
    3,435
    Total Downloaded
    0
    Ok bought a one meter length of the link belt. It worked out to about 80mm left over.
    Easy enough to fit and now its all go

    lathe by [url=https://www.flickr.com/photos/141809689@N05/]

  6. #16
    Join Date
    May 2007
    Location
    in the wild New England, NSW
    Posts
    4,918
    Total Downloaded
    0
    pleased to see that it worked out - I'm sure you will confirm that it is better than the alternative

  7. #17
    Join Date
    Jun 2009
    Location
    Queensland
    Posts
    3,435
    Total Downloaded
    0
    Absolutely

    It took about 10 mins, and I am getting slow.
    It would be a challenge for me to pull all those shafts and bearings out.

  8. #18
    Join Date
    Sep 2012
    Location
    Westlake ,brisbane
    Posts
    3,922
    Total Downloaded
    0
    Quote Originally Posted by 123rover50 View Post
    Absolutely

    It took about 10 mins, and I am getting slow.
    It would be a challenge for me to pull all those shafts and bearings out.
    I don't believe that . Nothing is a challenge for yo Keith.

  9. #19
    Join Date
    Jul 2006
    Location
    Brisbane, Inner East.
    Posts
    11,178
    Total Downloaded
    0
    Fortunately the one lathe I kept when I shut my machine shop is an all geared head, no belts other than the twin belts connecting the motor to the machine. A Liang Dei toolroom grade lathe made in Taiwan 1.2 m between centres and 350mm swing, gap bed, speeds 40 to 2000 rpm. Nice machine. I sold the three others, the big Russian universal mill, and a Bridgeport copy. I didn't have room at home. I gave away a shaper and a planer as I couldn't get one offer on them.

  10. #20
    Join Date
    Jun 2009
    Location
    Queensland
    Posts
    3,435
    Total Downloaded
    0
    Quote Originally Posted by 1950landy View Post
    I don't believe that . Nothing is a challenge for yo Keith.
    It is these days. I am starting to give the old Forward Control a freshen up. Its one job a day. One day G,box out. One day G,box in. etc. etc.
    I dont envy you with hassle with your floor.

Page 2 of 2 FirstFirst 12

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!