Hey Ace
Give up teaching man and get a job on "The Black Tar Gang"
You just posted our favourite complaint
"I WANT MY ROAD FIXED BUT DONT WANT TO PUT UP WITH THE HASSLE"
Andrew
They have ripped the road up out the front and down the hill towards the jail, now dont get me wrong it was well and truely over due, but its such a pain in the ****.
When they are cutting the tar out or using the rollers the whole hill shakes, and its that really low frequency vibration and it hurts your ears and shakes all the windows etc.
When they are working we continuosly get booted off the net aswell, it doesnt happen when they have knocked off so something they are doing is affecting the phone line.
We have had some heavy rain over the last couple of days aswell so now its turned to slush. Its funny cause every car in town is covered in the off white coloured slush from the road base.
When its done it will be great, i was sick of small car sized pot holes every time it rained but their site office is right over the road so its noisy as hell during the day, all i can say is i am glad i am not home for most of it.
The 4wd Zone/Opposite Lock Bathurst
263 Stewart Street, Bathurst, NSW
http://www.the4wdzone.com.au/
Discounts for AULRO members, just shoot me a PM before you purchase.
Hey Ace
Give up teaching man and get a job on "The Black Tar Gang"
You just posted our favourite complaint
"I WANT MY ROAD FIXED BUT DONT WANT TO PUT UP WITH THE HASSLE"
Andrew
DISCOVERY IS TO BE DISOWNED
Midlife Crisis.Im going to get stuck into mine early and ENJOY it.
Snow White MY14 TDV6 D4
Alotta Fagina MY14 CAT 12M Motor Grader
2003 Stacer 525 Sea Master Sport
I made the 1 millionth AULRO post
Yep, that section of highway near the Mudgee turnoff is well due for some love and attention.
If you are having problems with vibration from the roadworks, go and see a site supervisor TOMORROW. Roadworks contractors are usually receptive to resident complaints and might be able to change their workpractices to reduce nuisance to you. If nothing else, you have to let them know of your complaint sooner rather than later if there is the slightest chance of you ever having a claim against them later (for vibration damage, loss of business etc).
"Road works" Isn't that a tautology?
Diana![]()
You won't find me on: faceplant; Scipe; Infragam; LumpedIn; ShapCnat or Twitting. I'm just not that interesting.
It doesnt bother me that much, the end product will be worth it. I understand the work they need to do (any you Landyandy) and that alot of people probably complain about it all the time, but its only for a few months and they will slowly work their way down the hill away from the house so it wont even bother us that long.
But as you say it needed doing badly, it stuffs me how their havent been more accidents, some of those pot holes were massive.
The 4wd Zone/Opposite Lock Bathurst
263 Stewart Street, Bathurst, NSW
http://www.the4wdzone.com.au/
Discounts for AULRO members, just shoot me a PM before you purchase.
You may have a polite chat with the works manager,but the vibration wont stop.
Compaction standards have to be met.They are tested on every section.If it fails you pull it all out and start again,AND AGAIN if it fails the tests till the correct levels are met.
Its all part of the job Im afraid!!!!
Andrew
DISCOVERY IS TO BE DISOWNED
Midlife Crisis.Im going to get stuck into mine early and ENJOY it.
Snow White MY14 TDV6 D4
Alotta Fagina MY14 CAT 12M Motor Grader
2003 Stacer 525 Sea Master Sport
I made the 1 millionth AULRO post
The 4wd Zone/Opposite Lock Bathurst
263 Stewart Street, Bathurst, NSW
http://www.the4wdzone.com.au/
Discounts for AULRO members, just shoot me a PM before you purchase.
Hells bells you want road works come to this hole for look, they resurface roads here that dont need it as the Local Government allocates a huge budget for roads and i mean huge, every couple years we get a re seal job, they just spray the black gook on the road and tip light wieght gravel everywhere, so this is good for the windscreen shops, just as the risk of losing a screen has abated the goons come and reseal what was just resealed, its madness, our roads here are like bowling pin alleys, a real genuine waste of resources, and the roundabout things they must plant a seed and the next day a roundy bout is there where it wasnt the day before.
Work practices can be changed to reduce effects on adjacent properties. Changing the vibration frequency can change vibration travel (though it does also change compaction performance) or if serious enough, use dead weight compaction instead of vibration (though usually only warranted in heavily built up areas with heritage houses close etc.).
| Search AULRO.com ONLY! |
Search All the Web! |
|---|
|
|
|
Bookmarks