The Range Rover CV's have a outer halfshaft with an integral flange so this would cause complications with the series halfshafts. However the County and Stage 1 CV's are very similar, so it may be possible to use a standard Series III 109 housing assembly, stub axle and halfshafts. Then use the county/110 hubs, rotors and drive flanges.
The important factors that need measuring are:
- Are the OD of the Series stub axle and the 110 stub axle the same?
 - Will the inner hub seal on a 110 hub mate properly with the series stub axle?
 - Will the 110 hub mount the wheel in the same location (track wise) as the series hub with drum fitted?
 - Is the length of the 110 stub axle the same length or shorter than the series stub axle?
 - What modifications/additional thrust washers etc will be required to fit the series halfshafts to the 110 drive flanges?
 



				
				
				
				
					