The snorkel was installed by RAG Fabrications (me

) in May 08 in Darwin before the drive back to Gove. If only I had followed the template.
Brushbar went on in July 08 as it was the lowest cost at the time. It has almost shaken off so it will be replaced by an ARB bar (cheapest for me to source) before we head to the Kimberley in late June 2011. Lights went on soon after the bar.
TRS chipped ECU was installed in Aug 2008 and then the new intercooler fitted in Jan 2009 (thanks Derek

)
Had some LR side steps given to me (I did appreciate that thanks Erich) but decided to go one step further with the Bearmach sliders to help little old ladies climb in
Things to do:
Have a dual battery kit waiting to be fitted but this may need to go in the rear as the Provent also needs to be fitted. Bullbar will need to go on, would like to discover an eco-friendly reason to care for the environment and therefore NEED to source a rear bar with wheel carrier - still working on that one tho'

.
As an ex-pilot an EMS needs to go in too. However first I think some checkerplate for the tops of the sliders to act as a step and mud flaps/stone guards.
Now Pedro - what was that about you showing me yours once I showed you mine

Bookmarks