Page 18 of 35 FirstFirst ... 8161718192028 ... LastLast
Results 171 to 180 of 342

Thread: c.h.i.e.f 's 110 Isuzu county

  1. #171
    Join Date
    Sep 2007
    Location
    Kiwiland
    Posts
    7,246
    Total Downloaded
    0
    My records show a 390mm flywheel, so that's probably the same as your 388.

    Have you looked at what the flywheel touches in the 4BA1 housing and what would need ground out for the 388mm flywheel to fit?

  2. #172
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0
    Quote Originally Posted by Dougal View Post
    My records show a 390mm flywheel, so that's probably the same as your 388.

    Have you looked at what the flywheel touches in the 4BA1 housing and what would need ground out for the 388mm flywheel to fit?
    390 is probably the more accurate measurement as I only used a large set of calipers and a rule well I shal measure the OD of the housing and see if there would be enough wall thickness left if not suitable I will need to locate another housing...

  3. #173
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0

    Unhappy

    So far no good with the flywheel developments as I can't seem to find anywhere to balance it so I have not proceeded with the ring as of yet...I'm not sure if there is any accurate way of balancing it myself or I would have it done by now...

  4. #174
    Join Date
    Jan 1970
    Location
    Piggabeen (Tweed Heads)
    Posts
    2,930
    Total Downloaded
    0

    Balancing

    Quote Originally Posted by c.h.i.e.f View Post
    So far no good with the flywheel developments as I can't seem to find anywhere to balance it so I have not proceeded with the ring as of yet...I'm not sure if there is any accurate way of balancing it myself or I would have it done by now...
    We used a performance motor builder up here for balancing, BUT he wants us to get him a complete crankshaft for future balancing jobs as it will make it easier for him to use this as a jig.

    So has anyone got an old 3.9 or 3.6 etc crank laying around???? Then we have a source for balancing.

    Justin

  5. #175
    Join Date
    Jan 1970
    Location
    'The Creek' Captain Creek, QLD
    Posts
    3,724
    Total Downloaded
    0
    Quote Originally Posted by c.h.i.e.f View Post
    So far no good with the flywheel developments as I can't seem to find anywhere to balance it so I have not proceeded with the ring as of yet...I'm not sure if there is any accurate way of balancing it myself or I would have it done by now...
    When I lived down you way and wanted good engine work done I would only take it to a place in Islington/Hamilton whose name escapes me.

    Driving from Newcastle toward Islington, they are on the left near the plumbing place, just before the Beaumont Street traffic lights.

    They balanced my 4BD1T.

  6. #176
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0
    I had one engineering place hesitate and say yes we will do it but when I asked how they will do it they couldn't give me a satisfactory answer... Only option I am still thinking about is doing it between centers

  7. #177
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0
    Quote Originally Posted by Bush65 View Post
    When I lived down you way and wanted good engine work done I would only take it to a place in Islington/Hamilton whose name escapes me.

    Driving from Newcastle toward Islington, they are on the left near the plumbing place, just before the Beaumont Street traffic lights.

    They balanced my 4BD1T.
    Thanks John I'll see if I can find the name of the place and see what they say...

  8. #178
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0
    Would it be teterin engineering ?

  9. #179
    Join Date
    Aug 2006
    Location
    WA
    Posts
    13,786
    Total Downloaded
    0
    Quote Originally Posted by c.h.i.e.f View Post
    I had one engineering place hesitate and say yes we will do it but when I asked how they will do it they couldn't give me a satisfactory answer... Only option I am still thinking about is doing it between centers
    Have a read here - I am sure gromit could answer some questions.
    Isuzu C240 powered Series 3

  10. #180
    Join Date
    Jul 2008
    Location
    Cessnock NSW
    Posts
    1,506
    Total Downloaded
    0
    Just called teterin engineering they closed that side of the business a few years ago

Page 18 of 35 FirstFirst ... 8161718192028 ... LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!