Busy few days, in between work, SaPol Range inspections (Rifle club) and more work (!) I’ve managed to complete a few tasks on the D4.
Started with R&R a new radiator to replace the 12 year old unit which had started weeping on the LHS (not at the tank but where a tube is joined to the end).
That kept me going Tuesday from 8pm until 5:30am Wednesday.
New radiator and coolant now in play.  For those interested I run Penrite Blue.
Wednesday was 40°c so another late start finishing bleeding the cooling system.  Then onto the next job, plumbing in the new Transmission cooler.  Most of the work completed and an early night (01:00am)
Thursday was back to work (Budget and 5 year plan was flavour of the day).  Thankfully inside as it hit just shy of 43° and my workshop cooler has recently failed 
 
 
20:30 headed back to the workshop (was only 32° by then outside) and replaced the transmission filter, did a flush (12 litres used) and buttoned it all back up. Penrite BMV used (second time I’ve used it without a single issue).
Quick test run around town, adding in a few laps of the hilly areas to load it up.
Stable temps
87°c Coolant
90°c Engine oil
72°c Transmission
Happy with that, tomorrow the van will be hooked up and off to Tumby Bay.
Whilst awaiting for transmission to cool I also managed to squeeze in a small repair to the van, reloaded a weekends worth of projies (300WSM 200gr Berger Hybrids for those that know), cleaned the ‘tool’ used to ‘send them’ on target and got the gear packed ready for the trip away.
Nothing like a relaxing week 

. It’s now 03:20 and I’m done for the day!
Bookmarks