Got the blue slip or roadworthy certificate today - not much else. All the other work still has to be done.
We will book the car in on Monday for the authenticity check. The lead time on this is usually 3 weeks.
That gives us 3 weeks (of spare time) to strip the car down again, fix the 2 front guards, repair some small dings, prepare all the panels and body, prime, 3 coats of paint and 3 coats of clear, then re-assemble and re-install screen. Still unsure of the colour - white at this stage is the easiest by far.
Also picked up the rear tail shaft and made enquiries about new springs and shocks.
Andrew is chasing up on wheels and tyres and a sound system.
Erich



Reply With Quote




Bookmarks