Its a Govt site, about 20yrs old, they dont spend money on, desk jockeys with no idea as usual.
There are two chillers, smaller one handles the load no problem, even on the hottest day.The larger chiller short cycles and continually trips on oil failure.It was probably installed originally to cope with site expansion, but the newer buildings have DX units.So work that out

The BMS is way out of date, no parts available, so nothing really works properly, through out the whole site,AC wise.
There was a quote from the chiller manufacturer, to fit a PLC for chiller plant only, which would sort out all the main plant issues, also save a heap of power, and was ready to go.
The Newman govt put an end to that and subsequent governments have done nothing as well.
The power they are wasting, and huge maintenance costs is absolutely ridiculous,but no one seems to care.
An upgrade would pay for itself in a few months, with reduced power, reduced maintenance, and wear and tear on equipment.
But instead, throwing AC units in schools, seems a better option, its all about votes.